| Barbara Ferrell prepares
lunch on Feb 20 in the Center's newly completed kitchen. |
New stove and heating
oven. |
|
|
|
 |
 |
 |
 |
 |
|
Bill Rumble & Terry Hough
(Public Works & Engineering) oversee paving of the parking lot in front
of the new lobby (July 26, '07) |
The new lobby decked out for
our first open house on August 2. More than 150 people attended. |
Move-in for the BOPARC
Seniors began August 13. Carpeting must be installed and other
projects completed before the move-in is finished. |
The new kitchen is now
beginning to look like a kitchen. |
10/10/07. The stove
hood and venting system is now being installed. It will be
finished this week. Those who attend the luncheon on Wednesdays
are glad to see this happening. |
 |
 |
 |
 |
|
|
The circular piece of
equipment is the cap for the hood vent. Behind it is the new
stove, both to be put in place this week. |
The new lobby begins to
fill up with items to be placed in various rooms when our occupancy
permit has been issued (Sept. 13, 07) |
More stuff arrives in
BOPARC trucks. As things were being moved in, a bridge game was
already underway in the new lobby (not pictured because I left my camera
at home). |
|
|
 |
 |
 |
 |
 |
|
Notice that the janitor's
storage closet (photo 2 above) has been removed to make room for a
serving line in the new kitchen. |
A worker for Veritas
Construction cuts a new doorway that will provide stairway access from
the new lobby to the Director's office and sitting room on the main
floor of the school. Windows have been removed and will be blocked
in as per fire marshall requirements for a 2 hour fire wall. |
The new lobby area. By
the first of next week, the first week of March, we will be able to show
block being laid for the lobby walls. |
n this and the following
photo, construction debris. |
|
 |
 |
 |
 |
 |
| Feb. 6, '07.
Gravel base for poured concrete floor. Ditch in foreground is for
front wall & entrance to the new lobby. |
Notice
that gravel inclines upward right to left by gym wall to create handicap
entrance ramp from lobby to gym |
Doorway
from new lobby to director's office. A stairway will provide
access to this new doorway. |
Metal
studs define various work spaces in the new kitchen in this and the next
photo. |
|
 |
 |
 |
 |
 |
|
Sam Proctor of Veritas
Contracting fork-lifts the beams from the truck for transport to a
staging area near the school. |
It was slow going down
Eureka to the school. The beams overlapped the curbs of the street
by several feet on both sides. |
April 12, '07. In this
and the two following photos, the roof beams are being lifted into
place. |
|
With the roof on the lobby,
and a pyramid skylight in the middle of it, finishing work will begin on
the lobby itself. The kitchen is also moving along very nicely. |
 |
 |
 |
 |
 |
|
Doorway and window of the
new entrance and lobby. With good weather this week, March 19, the
walls will be finished and the roof will go on. |
Inside
new lobby looking toward tot lot. The floor has been poured and
the roof is ready to go on. March 27, '07. |
Handicap access ramp from
lobby to gym. The white pipes in background are drain connections
for a unisex bathroom. |
Old Window openings being
filled in with brick and block to create a two-hour fire break between
new lobby and director's office/lounge room. 3/27/07 |
Fabricated steel roof beams
arrive by semi from Alabama. The streets are too narrow for the
driver to get any closer to the school than Eureka Drive. |
 |
 |
 |
 |
 |
|
Sunday, June 3, '07.
Installation of drywall will be completed today in the new lobby.
Finishing work will be done this week, along with painting. |
Grid work is in place for
the drop ceiling in the kitchen. Door frames will be painted and
doors installed this coming week. Equipment should be installed by
mid month. |
Grid work is in place for
the drop ceiling in the kitchen. Door frames will be painted and
doors installed this coming week. Equipment should be installed by
mid month. |
Once these light fixtures
and heating vents are put in place, the ceiling of the Lounge Room will
be complete. |
June 18, 2007. The
skylight in the new lobby. |
 |
 |
 |
 |
 |
|
Cement pad poured at
entrance to the new lobby. The rest of the area in front of the
lobby will be blacktop. |
Stairway between new lobby
and director's office being installed last weekend. Sam Proctor
(red shirt) is owner of Veritas Contracting. |
Stairway
installed. |
Doors and window of new
lobby now in place (6/18/07). |
A family enjoys Sunday
brunch under the old maple tree in Wiles Hill Park. The tree has
been there since 1910 (we think) and will be remembered by all alumni of
the school. |
 |
 |
 |
 |
 |
|
The band room and breezeway
to the gym as it looked up until last week (Feb. 20, '07). The round
containers were for removal of asbestos tile. |
The band room just after the
asbestos tiles were removed and before kitchen renovation began last
week. |
The breezeway is now gone
and the asphalt has been dozed away to make room for a cement floor for
the new lobby and handicap entrance. |
Here's the band room today
as work is underway to provide utilities for the new kitchen. The
next two photos show other perspectives on this renovation. |
|
 |
 |
 |
 |
 |
|
Carlos, Kennedy Center
inmate, paints walls of new lobby (June 30, '07) |
Harold, also from the
Kennedy Center, paints another wall of the new lobby. |
New drainage system being
installed in preparation for paving in front of new lobby. (July 6) |
Amy, RSVP director, and
Hobe, assistant to the senior center director, paint stairway in new
lobby. |
Floor tile being installed
in new lobby. (July 10) |
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|