 |
 |
|
|
|
|
The main hallway looking toward the back of the school as of Feb.
20,2008. |
The main hallway looking toward the front of the school. There are
areas like this throughout the new facility where small groups can sit
and talk. |
|
|
|
 |
 |
 |
 |
 |
|
Lights for Handprint
Illumination |
|
Back Stairwell |
Water Damage in Back
Stairwell |
|
 |
 |
 |
 |
 |
|
Stair to Assembly Room |
|
More Water Damage Because
Roofer did not fix Roof |
|
|
 |
 |
 |
 |
 |
|
Water Damage to Floor |
Painting Begins |
|
|
|
 |
 |
 |
 |
 |
| |
|
|
|
|
 |
 |
 |
 |
 |
|
Painting To Date |
Handprints Lighted March 6,
2006. We thank the WV Development Office for a Grant to Make
Preservation of this Historical Artifact Possiible. |
|
Replace Fallen Plaster, Dale
Schmidt |
Squaring Plaster for
Fiberboard Replacement |
 |
 |
 |
 |
 |
|
Dale Schmidt Anchoring
Fiberboard |
|
|
Trim in Place March 10, 2006 |
Ready for Spackling & Paint |
 |
 |
 |
 |
 |
|
Richard Herstine Stripping
Old Varnish 3/16/06 |
Ready for New Finish;
Transom to be Reinstalled |
Window Front Doorway |
Doorway in Original
Condition with Transom Window Removed and Filled in with Drywall |
New Paint in Hallway 3/12/06 |
 |
 |
 |
 |
 |
|
Baseboard Teal Stensil
3/13/06 |
|
New Paint and Mirror
(temporary) |
Cold Air Return Vent & Door
Trim: Before |
After: 3/21/06 |
 |
 |
 |
 |
|
|
Applying Red Oak stain to
door frame; ready for polyurethane 3/23/06 |
Painting Floor 3/28/06 |
|
Painted portion of floor
stops where original wood floor begins. Original wood floor
(foreground) will
be sanded and varnished. |
|
 |
 |
 |
 |
 |
|
Installation of ADA chair
lift begins. 4/27/06 |
|
|
|
Installation completed May
5, 2006 |
| |
|
|
|
|
| |
|
|
|
|